1st Superstructure and partial reconstruction of the building of the  TS 400/220/110 kV Pljevlja.

2nd Replacing the roof on the TS 110/35 kV Centre in Podgorica.

3rd A complete reconstruction of the building with the construction of a new roof of the TS 110/35 kV Tivat.

4th A complete reconstruction of the building with the construction of a new roof oh the TS 110/35 kV Bioče-Podgorica

5th  Construction of the facility for 10 kV station Zeta.

6th  110 kV two-pole switch, built by Siemens, for the railroad. Complete construction and electrical works.

7th Roof replacement and reconstruction of the TS 110/35 kV Poda in Herceg Novi.

8th  Reconstruction of objects, making the ground breakers, disconnectors and manufacture of cable channels for TS 110/35 kV Niksic.

9th Tens of kilometers of 10 kV HV and LV networks (civil works and part of electrical installation works).

10th Construction of a new facility for the 35/10 kV TS Vranjina.

11th Complete construction works on the transformer box 110/35 kV T2, line fields 110 kV Bar and part of the  works on the transformer field110/35 kV T1. Construction and hardware works on the system bus and second input wrigley for 110 kV in the 110/35 kV Ulcinj. Creating transformer, fire wall, cable channels, oil pit, rainwater trench.

12th Complete construction work on the transformer box 110/35 kV T2, line fields 110 kV part of Cetinje and part of the works on the transformer field on 110/35 kV T1. Construction and hardware works on the system bus and second input Wrigley for 110 kV in the 110/35 kV Cetinje. Creating transformer fire wall, cable channels, oil pit, rainwater trench. (Donated by the Government of Norway)

13th Construction work and a small part of the electrical installation works on the 110 kV Podgorica-Cetinje (115 columns), Podgorica-Bar (15 poles) and Podgorica-Budva (15 poles).

14th Refurbishment and construction of the part of the cable channels in almost all TS in Montenegro.

15th Power 10 kV line with post-mounted transformer substation STS 10/04 kV, the foundation and pillar of STS 10/04 kV and low voltage underground power cable repeaters Obrov Bijelo Polje (construction work).

16th Complete reconstruction and development of a new pitched roof of the building of tower transmission line crews and 100 kV TS Nikšić

17th The construction or reconstruction of classic residential and commercial properties in several locations in Montenegro.